NEWS
İçerikler
ST INDUSTRY MAGAZINE, Onur Ünlü Interview
25th January, 2020 TURKONFED Energy Efficiency New Approaches Meeting / Çorlu
26th June, 2019 The Wrongs and Failures Panel in BUSIAD Energy was organized.
3th October, 2019 The report presentation was made of the Financing of Energy Conversion in Turkey!
19th August, 2019 Credit from the World Bank for energy efficiency in buildings!
17th October, 2019 Energy Producing Factories Summit 22-23-24 October 2019 Wow Convention Center
9th April, 2019 Low carbon heroes have become obvıous, ınstıtutıons that keep carbon accountıng well are awarded.
20th August, 2019 Eco-Industrial Park transformation in Izmir: Yesil IAOSB
4th December, 2018 ESCO workshop and technical trip to Germany
Desıgn & Productıon project of Multıple Evaporator Desalınatıon System
26th September, 2019 ST INDUSTRY RADIO BROADCAST Factories Producing Its Own Energy
We participated in the TURKISH-GERMAN ENERGY FORUM.
H & M provides consulting for its suppliers as part of the resource efficiency (clean production) study.
Sütaş East-Southeast Anatolia Sütçülük project Bingöl factory investment project design service was started.
AUTOMOTIVE GLASS ALLIANCE Russia (AGAR) Detailed Project Audit completed.
17 th April 2018, Energy Efficiency was discussed in BUSIAD.
ESCON participated in the 9th EVF Forum and Fair. Sector representatives came together at the 9th Energy Efficiency Forum and Fair (EVF), which took place on 29-30 March 2018 at the Lütfi Kırdar Congress and Exhibition Hall.
RENEWABLE ENERGY AND ENERGY EFFICIENCY CERTIFICATES workshop was held.
Energy Efficiency Consultancy was carried out within the scope of GAZİANTEP METROPOLITAN MUNICIPALITY / SEIEP Project.
RENEWABLE ENERGY AND ENERGY EFFICIENCY CERTIFICATES workshop was held.
EGE ÇELIK, BEYPILIC and Pınar SÜT audits were completed within the scope of” increasing energy efficiency in industry project.
European Union (EU) / Instrument for Pre-Accession Assistance (IPA), Energy Sector Technical Assistance Project, Consultancy Services for Energy Efficiency (MENR IPA 12 / CS04) were carried out.
MHI cooling groups were used in the newly established SÜTAŞ İzmir / Tire Factory. Performance guaranteed turnkey application of a total of 6 chillers was carried out by ESCON.
A preliminary audit was conducted at the Pepsi / Lebanon S.M.L.C factory.